Plantline · Line Base Co case study
Case study · OEM components

Plantline

A complete ERP for a press shop, built to replace the legacy system it had outgrown. Every step from enquiry to cash now runs on one thread, and most of it runs itself.

34modules
6workflow stages
1thread, enquiry to cash
Plantline Today page with year-to-date, quantity progress, dispatch and tool health
Owner morning brief on a phone
The application

An OEM metal components plant stamps, welds and ships parts against customer schedules that move every week. Its ERP was a desktop system built around forms: every lot number typed, every handoff keyed again on the next screen, and nothing after the invoice. Line Base rebuilt it as Plantline, one application covering commercial, planning, the shop floor, quality, dispatch and finance, where a scan or a decision in one place moves the work in the next.

ClientOEM metal components manufacturer
Built byLine Base Co, design and development
ReplacedThe plant’s legacy ERP, end to end
Runs onDesktop, floor phones and QR labels

The legacy ERP, retired

We usually connect to the systems a factory already runs. Here the ERP itself was where the work slowed down, so we rebuilt it around how the floor actually moves.

Identity on the floor

Lot numbers typed from paper tags. Heat numbers picked from a dropdown.

Machines, coils, lots and zones carry QR codes. One scan identifies, checks and posts.

Data entry

The same job keyed again on screen after screen, in multi-page forms.

Entered once, at source. Every later step reads it.

Where it runs

A desktop in the office, keyboard and mouse.

Phones at the press, the QA table and the gate. Desktop for planning and accounts.

Planning

Monthly schedules recorded. Press-by-day loading and tool readiness worked out outside the system.

A scheduler that loads every press by day, weighs the trade-offs and shows its reasoning.

Pricing

Metal-linked price revisions worked out in workbooks, part by part.

Metal index, parts costing and quotation are linked. A rate change reprices every part.

Money

The system stopped at the invoice. Receivables, margin and approvals lived elsewhere.

Collections, cash flow, PO approvals and job margin sit on the same data as the floor.

Enquiry to cash, one thread

Six stages, 34 modules. Each stage hands the next one its work, so nobody carries it across by hand.

  1. I · 7 modulesWin the orderAn agreed quotation becomes an order and a schedule.
  2. II · 7 modulesPlan and buyThe schedule becomes material demand and press load.
  3. III · 6 modulesRun the floorThe released plan becomes jobs on each press phone.
  4. IV · 4 modulesProve qualityA made lot reaches QA by scan, with its history.
  5. V · 5 modulesShip and billA cleared lot becomes a pack list and an invoice.
  6. VI · 5 modulesMoney and controlThe invoice becomes a receivable and a cash forecast.

How we worked

Four steps, the same cadence as every Line Base engagement.

01Floor visitWalked the shop and sat with planning, stores, QA, dispatch and accounts.
02Map the legacyEvery screen, report and register of the old ERP mapped to the work it actually did.
03Build in workflow orderShort rounds. The team tried each module on real parts and orders.
04Cut overModule by module, with no double entry, training on the floor and support after.

Everything Plantline runs

34 modules in six stages, in the order the work moves. Tap one to jump.

What changed

Not a new skin on old forms. A different way for the plant to run.

One system of recordCommercial, floor, quality and accounts work on the same part, lot and order. Nothing to reconcile between systems.
Scan, do not typeIdentity comes from a QR code, so the wrong coil, the wrong lot and the wrong count are stopped at source.
Plans that explain themselvesThe schedule shows why each job sits where it does. Changing it becomes a decision, not an argument.
Trace in one scanFrom a finished lot back to the coil, tool, press and shift, on a phone, in the time it takes to ask.
Billing without re-keyingInvoice, e-way bill and challan are produced from what was packed, at the price that was agreed.
The owner sees the plantOutput, risks, approvals and cash in one brief, without calling anyone for a report.
Win the orderPlan and buyRun the floorProve qualityShip and billMoney and controlNext: Samvaad

Win the order

Modules 01 to 07

Every job starts as an enquiry. Plantline carries it through costing against the live metal index, a quotation the customer can check line by line, and a schedule the plant can commit to, without anyone keying a part number twice.

How the work moves
  1. Enquiry logged
  2. Part costed on live metal
  3. Quotation issued
  4. Price agreed
  5. Schedule loaded
Plantline Today page with year-to-date, quantity progress, dispatch and tool health
01 / 34

Today

The first screen every role opens. What is due, what is late and what needs a decision today, pulled live from every module below.

  • Dispatch, quantity progress and tool health on one page
  • Exceptions surface on their own: shortages, QA holds, approvals
  • Every number opens the screen behind it
Enquiry CRM board from new enquiry to won
02 / 34

Enquiry CRM

Enquiries from email, phone and factory visits land in one pipeline, with the drawing, the annual volume and the target price attached.

  • Stages move as costing and quotation complete
  • Follow-ups dated and owned, so nothing sits in an inbox
  • A won enquiry becomes a part master and an order, not a re-entry
Quarterly price variation quotations by customer
03 / 34

Quotation

The quotation workbook is generated, not typed. Price working, metal working and terms sit on one versioned document.

  • Prices pulled from parts costing, rates from the metal index
  • Each part marked as-is, no change or revised
  • Customer acceptance tracked against every version
Monthly metal index with quarterly averages
04 / 34

Metal index

Monthly metal and forex rates are entered once. Pure metal, alloy base and the quarterly average recalculate for every alloy the plant buys.

  • Monthly rates roll into the quarterly average on their own
  • Melting and fabrication charges applied per alloy
  • Every part priced on that alloy is flagged when the base moves
Part costing from weights, scrap and metal index
05 / 34

Parts costing

Gross weight, finished weight and scrap recovery sit on the part. When the metal base moves, the price variation is worked out for every part, for every customer, in one pass.

  1. 1Price variation computed per part from the quarterly alloy base
  2. 2Scrap recovery and fabrication itemised, so the working can be shown to the customer
  3. 3Revised prices flow to the quotation and, once agreed, to the invoice
  4. 4Agreement tracked part by part, quarter by quarter
Customer dispatch schedule with stock cover by day
06 / 34

Order & schedule

Customer schedules become a dispatch calendar. Requirement, buffer and stock are netted to show what production actually owes, by part and by day.

  • Requirement plus buffer, minus what is on hand
  • Balance to produce updates as the floor reports output
  • Late and at-risk lines flagged before the customer calls
BOM explosion with child parts and raw material rollup
07 / 34

Component masters

One master for each part: raw material, bill of material, tool, press and packing standard. Every other module reads from it.

  • Grade, strip size and gross weight drive issue quantity and costing
  • Tool and press mapping drives the scheduler
  • Change it once and planning, floor and billing all follow

Plan and buy

Modules 08 to 14

A confirmed schedule turns into material and machine demand on its own. Plantline nets stock, raises what is short, receives it against a heat number and loads the presses.

How the work moves
  1. Schedule netted against stock
  2. Shortage raised
  3. PO approved
  4. Coil received and tagged
  5. Heat cleared
  6. Presses loaded
Inventory grid with requirement, stock, balance and raw material cover per part
08 / 34

Inventory grid

Raw material, work in progress and finished goods for every part on one grid, with cover measured against the dispatch calendar.

  • Stock by stage, from raw material to packed
  • Cover calculated against the live schedule, not a fixed reorder level
  • Movements post from scans, so the grid matches the floor
Raw material shortages ranked by the day the press stops
09 / 34

RM shortages

Material that will run out before the schedule does, ranked by the day it bites.

  • Requirement exploded through the bill of material
  • Open POs and material in transit netted off
  • One action raises the purchase for the gap
Purchase orders with RFQ comparison and the shortage behind each order
10 / 34

Purchase

Requests, supplier quotes and purchase orders in one flow, priced against the metal index of the day.

  • PO drafted from the shortage, with supplier, grade and rate filled in
  • Routed for approval by value
  • Delivery promises tracked against the day the material is needed
Goods receipt with heat number, weighbridge check and coil tags
11 / 34

GRN & heat

Material is received against the PO, weighed, and given a heat number and a coil tag before it reaches the store.

  • Quantity and rate checked against the PO at the gate
  • Each coil gets its own QR tag
  • The heat number travels with the coil into every lot made from it
Incoming inspection report against the control plan and mill certificate
12 / 34

Incoming QC

Inspection against the grade’s control plan, with the mill test certificate attached to the heat.

  • Checks and sampling loaded from the grade
  • Accept, hold or reject updates stock status at once
  • Uncleared material cannot be issued to a press
Monthly production plan for one press with days required
13 / 34

Machine planning

Which part runs on which press, at what strokes per minute, with which tool. Capacity per day is calculated rather than assumed.

  • Maximum pieces per day from strokes per minute and available hours
  • Primary and alternate presses held for each part
  • Load against capacity visible before the plan is released
Machine by day schedule with objective weights and score explanation
14 / 34

Production scheduler

The scheduler builds the machine-by-day plan and explains it. Dispatch urgency, utilisation, tool health and changeovers are weighed, scored and shown, so a planner can move a weight and watch the plan respond.

  1. 1Trade-offs are weights the planner can move, not rules buried in code
  2. 2Every press loaded by day, around tool maintenance and material arrival
  3. 3Each placement carries its score and its reasons, in plain words
  4. 4Every re-run records what it improved

Run the floor

Modules 15 to 20

On the floor nothing is typed twice, and most things are not typed at all. Machines, coils, lots and zones carry QR codes. The phone asks for a scan, a count and a confirmation.

How the work moves
  1. Job on the press phone
  2. Machine and coil scanned
  3. Pieces reported
  4. Bin weighed
  5. Lot card printed
Live floor tiles for every press with plan against produced
16 / 34

Live floor

Every press on one wall: what is running, who is on it, how far the job has run against plan, and what has stopped.

  1. 1Shift output against plan, without waiting for the shift-end report
  2. 2Each tile updates as operators scan in, report and close jobs
  3. 3Stoppages carry a reason and a running clock
  4. 4A live feed of weighings, issues, QA moves and approvals
Tool schedule for today, tomorrow and maintenance due by strokes
15 / 34

Tool schedule

Every press tool with its stroke count, its life and its next maintenance, tied to the jobs planned on it.

  • Strokes accumulate from production reports
  • Status moves from safe to warning to critical as life is used
  • Maintenance is booked into the schedule before the tool fails on a job
Daily production report by machine for the shift
17 / 34

Machine DPR

The daily production report is filled by the operator on a phone at the machine, in the time it takes to fill a bin.

  • Job, part and tool already filled from the plan
  • Pieces, rejections and downtime entered once, at source
  • Output posts to stock, tool strokes and the order balance together
Weighing station converting bin weight to pieces and printing a tag
18 / 34

Weighing & bins

Bins are weighed, not counted. The piece count comes from the unit weight on the part, and the in-process tag prints with it.

  • Net weight converted to pieces from the part master
  • Bin tag printed with lot, part, press and operator
  • Count variance against the production report flagged at once
Raw material issue register written by scans, with checks
19 / 34

RM issue

The operator scans the machine plate, then the coil. Plantline checks grade, heat and QC status before the first stroke.

  • The wrong grade or an uncleared heat is stopped at the scan
  • Issue quantity and coil balance posted without a slip
  • The coil is tied to the job, so the lot inherits its heat
Lot card, machine plate, coil tag and zone tag with QR codes
20 / 34

Lot & QR labels

The lot card is the moving identity of the job. One printed card carries the lot from press to QA to dispatch, and one scan at any point shows where it has been.

  1. 1The lot card prints at the machine the moment the job is made
  2. 2Permanent plates for machines and zones, a tag for every coil
  3. 3Every code is registered: what it identifies and where it was born
  4. 4The code holds only an identity, so a label never goes out of date
On the phone

Make, in four scans

The operator’s whole job fits on one phone. No desktop to walk to, no slip to fill, no lot number to copy.

  1. 01Scan the machine plate. The planned job, part and tool are already there.
  2. 02Scan the coil. Grade, heat and QC status are checked before the first stroke.
  3. 03Report pieces, rejections and stoppages as the bins fill.
  4. 04Print the lot card. The job now has an identity that travels with it.
Machine DPR on a phone, opened by scanning the press plate
Machine DPR at the press
Floor scanner make journey: machine, raw material, pieces, lot card
Scan to make a lot

Prove quality

Modules 21 to 24

Quality is recorded against the lot, at the moment it is checked. What passed, what was sorted, what was reworked and why are all one scan away.

How the work moves
  1. Lot scanned at QA
  2. Control plan checked
  3. Lot split
  4. Genealogy updated
  5. Reports current
QA sort of a lot against its control plan with OK, rework and scrap split
21 / 34

QA & sort

The inspector scans a lot card and gets that part’s control plan. The lot is split into OK, rework, scrap and vendor return, and each split keeps its parentage.

  • Control plan loaded from the part, not from memory
  • Split quantities must add up before the lot can close
  • A repeating defect points back to the tool that made it
Laser welding line with stage counts and child lot consumption
22 / 34

Laser welding

Welded assemblies run through their own stage pipeline, from child-part kitting to weld, inspection and packing, logged batch by batch.

  • Child lots consumed into the welded lot by scan
  • Stage-wise work in progress for every assembly
  • Inspection results stored with the batch
Lot genealogy from receipt and heat to invoice
23 / 34

Lot trace

Pick any lot and see its whole life: the heat it came from, the press and tool that made it, who inspected it, and the invoice it shipped on.

FeedsImpact
  1. 1Genealogy built from scans, never from a register
  2. 2Forward: every lot and invoice a single heat became
  3. 3Backward: from a customer invoice to the coil, press and shift
  4. 4One action holds everything made from a suspect heat
Impact dashboard with dispatch, rejection, scrap reasons and utilization
24 / 34

Impact

Demo data

The reports the owner used to ask for are now standing screens. Dispatch, rejection, tool and yield performance are drawn from the same records the floor creates.

FeedsToday
  1. 1Delivery, rejection, tool downtime and yield, always current
  2. 2A library of standing reports replaces month-end compilation
  3. 3Rejection reasons are complete, because every split is a scan
  4. 4Utilisation by press, from the same records as the floor
On the phone

QA at the table, answers on the floor

Inspection happens where the parts are. And anyone holding a tag can ask the system what it is.

  1. 01Scan the lot card. That part’s control plan opens.
  2. 02Record the checks, then split the lot into OK, rework, scrap or vendor return.
  3. 03The splits must add up to the lot before it can be saved.
  4. 04Scan any code to see what it is, where it is and everything that happened to it.
Floor scanner QA sort with control plan checks and split
QA sort on the phone
Lot lookup on a phone with the lot history
Lot lookup, read only

Ship and bill

Modules 25 to 29

In the legacy ERP, invoice and e-way bill details were keyed in on separate screens after a dispatch. Now a packed lot becomes a tax invoice, an e-way bill and a delivery challan from the same record.

How the work moves
  1. Lots scanned into cartons
  2. Pack list printed
  3. Tax invoice raised
  4. E-way bill and challan
  5. Registers exported
Dispatch plan with FIFO lot picking, packing and pre-dispatch inspection
25 / 34

Dispatch & packing

Pack lists are built by scanning lot cards into cartons, against the day’s dispatch calendar.

  • Only QA-cleared lots can be packed
  • Carton labels and pack list print as lots are scanned
  • Short or excess against schedule shown before the vehicle is loaded
Dispatched challans awaiting invoice with price and PO checks
26 / 34

Pending invoice

Everything dispatched or ready that has not been billed, with its value and its age.

  • The queue builds itself from dispatch
  • Price taken from the agreed quotation revision
  • One action raises the invoice
GST tax invoice generated from challan with e-invoice QR
27 / 34

Tax invoice

A GST tax invoice with lines, HSN, tax and totals filled from the challan, the agreed price and the masters. The accountant checks it. Nobody types it.

  1. 1Lines, quantities and lots come from the scanned pack list
  2. 2Customer, HSN and rate are read from masters and the agreed price
  3. 3IRN and signed QR placed on the invoice
  4. 4E-way bill raised in the same step
E-way bills and job-work challans with validity and balance
28 / 34

E-way & DC

E-way bill and delivery challan prepared from the invoice and the vehicle at the gate.

  • Consignee, value and HSN carried from the invoice
  • Vehicle and transporter captured once, at dispatch
  • Job-work challans stay open until the material returns
Input tax credit reconciliation against GSTR-2B with exports
29 / 34

ITC export

Purchase and sales registers exported in the format the tax consultant files from.

  • Purchase invoices matched to receipts before they reach the register
  • A period export in one action
  • Mismatches listed for follow-up, not discovered at filing time

Money and control

Modules 30 to 34

The legacy ERP stopped at the invoice. Plantline carries on to the money: what is owed, what is due, what a job actually earned, and who is allowed to approve what.

How the work moves
  1. Invoice posted
  2. Receivable aged
  3. Cash forecast updated
  4. Approvals routed
  5. Margin known
Thirteen week cash flow with money expected and committed
31 / 34

Cash flow

Thirteen weeks ahead, built from what the system already knows: invoices raised, promises made, purchase orders placed.

  1. 1Thirteen weeks of money in, money out and closing balance
  2. 2Tight weeks stand out while there is still time to act
  3. 3Inflows from open invoices and promise dates
  4. 4Outflows from POs, receipts and payroll
Receivables ageing by customer with follow-up notes
30 / 34

Collections

Receivables by customer and age, with the follow-up owner and the promise date beside each invoice.

  • Ageing updates as invoices post and receipts land
  • Follow-ups scheduled from credit terms
  • Promise dates feed the cash forecast
Purchase order approval with reason, rate check and approval chain
32 / 34

PO approvals

Purchase orders wait in one queue with the shortage that caused them, the rate against the metal index, and the supplier’s record.

  • Routed by value to the right approver
  • Approve or send back from the phone
  • Every decision logged with who and when
Margin per part against the quoted margin
33 / 34

Job margin

Margin per job from actuals: metal consumed, scrap recovered, machine hours and rejection, against the price invoiced.

  • Actual metal consumption from issues and weighing
  • Conversion cost from reported machine hours
  • Jobs drifting below their costed margin are listed first
Role matrix by workflow chapter with audit trail
34 / 34

Roles & owner

Role-based access for every screen and action, an audit trail behind it, and a morning brief for the owner.

  • Operators, QA, stores, accounts and owner each see their own work
  • Every floor command is logged and safe to retry
  • The owner brief arrives on the phone each morning
FeedsToday
On the phone

The owner’s plant, in a pocket

Decisions do not wait for the owner to be at a desk, and reports do not wait for someone to compile them.

  1. 01A morning brief: what shipped, what was produced, what was collected.
  2. 02Purchase orders arrive with the shortage and the rate behind them.
  3. 03Approve or send back in one tap. The decision is logged.
  4. 04Every figure opens the screen it came from.
Purchase order approval on a phone
PO approval on the phone
Owner morning brief on a phone
Owner morning brief
What is next

Samvaad

Plantline already knows what every machine, lot and rupee is doing. Samvaad is the real-time agent that sits on top of all 34 modules. It watches the plant as it runs, answers in plain language, and acts through the same checked commands people use. That is the step from an automated factory to an agentic one.

  • WatchesEvery scan, report and posting is an event. Samvaad follows them as they happen and notices what a person would only find at the end of the shift.
  • AnswersAsk what is at risk this week, why a job moved, or where a lot is. It reads across modules and answers with the screens to prove it.
  • ActsIt drafts the purchase, proposes the reschedule or holds the lot, then waits for the right person to approve. Every action is logged like any other.
SamvaadNorthline Components Watching 34 modules
RM shortages · 09:42Copper strip CU-ETP-1.2 falls below Thursday’s plan
Thursday’s run of NL-1042-B for Orbis Motors is at risk. The copper strip on hand runs out on PP-03 before the lot is complete.Read fromOrder & scheduleInventory gridRM shortages
What are my options?
Two ways to hold the dispatch date:Approve PO-2611-044Alcobre Metals · 1,000 kg · ₹11.42 L · lands Thursday morningRe-run the scheduleBring NL-5230-C onto PP-03 until the coil arrivesRead fromPurchasePO approvalsProduction scheduler
Do both.
PO-2611-044 approved by Anand R. and sent to Alcobre MetalsSchedule re-run. PP-03 keeps running, no idle shiftOrbis Motors dispatch back on planLogged in the audit trail
Ask about the plant, in any language you work in
Concept preview · demo data
Samvaad One agent, reading and acting across every module in real time. WatchesAnswersActs
Win the orderTodayEnquiry CRMQuotationMetal indexParts costingOrder & scheduleComponent masters
Plan and buyInventory gridRM shortagesPurchaseGRN & heatIncoming QCMachine planningProduction scheduler
Run the floorTool scheduleLive floorMachine DPRWeighing & binsRM issueLot & QR labels
Prove qualityQA & sortLaser weldingLot traceImpact
Ship and billDispatch & packingPending invoiceTax invoiceE-way & DCITC export
Money and controlCollectionsCash flowPO approvalsJob marginRoles & owner

Tell us how your floor runs today

Speak to us today

Screens on this page show demo data. Customer, part and supplier names are illustrative.